Blank template

Print it, or save it as PDF

For a job sheet, a clipboard, or a contractor who prefers paper. The same eight parts as the builder.

Use the builder instead
Repair record

Repair completion report

Open / Closed

1 · What was reported

Job or ticket number
Where (building and unit, or common area)
Equipment, if known
Reported on, and by whom
What was reported, in the reporter's words

2 · What the contractor says

Name, company, role
When
Outcome: resolved / temporary fix / partly done / not done / no access
What was done
Cause, if known
Follow-up needed

3 · Checks

Who checked, and how (test run / measurement / looked at it / reviewed a photo)
When
What the check found
What it did not cover

4 · Evidence

Type, file name or link
What it shows, taken by, when

5 · The resident

Answer: resolved / not resolved / not asked yet / waiting / no reply / not applicable
Asked on, answered on, channel
The resident's words

6 · Still open

What is open, owner, next step, due date

7 · Closure

Closed by, role, when
Why: confirmed by the resident / work reported done, no reply / administrative / duplicate / cancelled / other
Reason in your words

8 · Later additions

When, by whom, what (a late reply, a revisit, a correction)