Work order close-out

The job card says "Completed". Does anyone know what that means?

What was done, what was checked, and is the resident's problem actually solved? Open Repair Record is an open guide and a free tool for an honest close-out: one record anyone can read, in any system.

Free, no account, and what you type never leaves your browser. Print it, save it as PDF, or send it on WhatsApp.

JOB CARDNo. Q-1204
Location
Tower 2, Apt 1204
Fault
AC leaking
Technician
Ravi K.
Remarks
Done.
Completed
Open Repair RecordQ-1204
Contractor saysResolved: cleared the drain · Ravi K., 11 Oct
Checked15-min test run · unit not inspected
ResidentNo reply (asked 11 Oct)
ClosedWork reported done, no reply after 4 days
The same fictional job, twice. Why it matters →

Repeat call-outs

A job closed on the contractor's word looks like a first-time fix, until the resident calls again.

Disputes

When an owner or a resident disputes a repair, a record of who said what is the first thing you need.

Handover

A new contractor, a new manager, a new system: the record travels as a PDF or a JSON file.

One record, six parts

A good completion report keeps each source of information apart. There is no single "done" box to tick.

1

What was reported

Where, when, and the symptom in the reporter's words. Kept apart from the diagnosis.

2

What the contractor says

Who reported the work, what they did, the outcome they claim, and anything left unfinished.

3

Checks and evidence

Who checked, how, what they found, and what the check did not cover. Photos or test logs, if any.

4

The resident's answer

Resolved, not resolved, not asked, waiting, no reply, or not applicable. Never assumed.

5

Who closed it, and why

The person who closed the record, the reason, and what still needs following up.

6

Later additions

A late reply, a revisit or a correction is added. Nothing earlier is rewritten.

The six parts in detail → · See a record built step by step →

Principles

Keep each source separate

A contractor's statement, a coordinator's check and a resident's answer are different things. The record says who said what.

No reply means no reply

Silence is never turned into a confirmation, however long it lasts.

A temporary fix is not a fix

If something is left to do, it gets an owner and a date, and the record stays honest about it.

Say what a check did not cover

"Ran it for 15 minutes" and "did not inspect the unit" are both useful.

Add, don't rewrite

Corrections and reopenings are new entries. The earlier version stays readable.

A record is not a certificate

It documents claims and checks. It does not certify safety or quality, and a photo is never required.

Open, and yours to use

The guide, the template and the examples are CC BY 4.0. The builder and the JSON format are MIT. Use them with any contractor and any software, copy them into your own instructions, or build them into your own tool.

Open Repair Record is a practical guide and toolkit, not an official standard. Where it overlaps existing housing data models, the format page says so.